Archives

Home   >   Archives   

5.5 bbo Yellowtail 1 marks ExxonMobil’s 13th find in Guyana

Rig Lynx
  • By Rig Lynx
  • Apr 21, 2019
  • Category : Archives
  • Views : 842

IRVING, Texas – ExxonMobil said it made a new oil discovery offshore Guyana at the Yellowtail-1 well, marking the 13th discovery on the Stabroek Block. The discovery adds to the previously announced estimated recoverable resource of approximately 5.5 billion oil-equivalent barrels on the Stabroek Block. Yellowtail-1 is the fifth discovery in the Turbot area, which ExxonMobil expects to become a major development hub.

  • Oil discovery at Yellowtail-1 well is fifth discovery in Turbot area
  • Turbot area expected to become major development hub
  • Adds to previously estimated 5.5 billion barrels of discovered recoverable resource

“Similar to the Liza area, successive discoveries in the Turbot area have continuously grown its shared value,” said Mike Cousins, senior vice president of ExxonMobil Exploration and New Ventures. “Our success here can be attributed to our industry-leading upstream capabilities, the strength of our partnerships and our ongoing commitment to growing Guyana’s offshore potential.”

Yellowtail-1 encountered approximately 292 feet (89 meters) of high-quality oil bearing sandstone reservoir and was drilled to a depth of 18,445 feet (5,622 meters) in 6,046 feet (1,843 meters) of water. The well is located approximately 6 miles (10 kilometers) northwest of the Tilapia discovery. The Noble Tom Madden began drilling the Yellowtail well on March 27. It will next drill the Hammerhead-2 well.

Exploration and development activities continue at other locations on the Stabroek Block. The Stena Carron is currently completing a well test at the Longtail-1 discovery and upon completion will next drill the Hammerhead-3 well. Later in 2019, the Stena Carron will drill a second well at the Ranger discovery. The Noble Bob Douglas drillship is currently completing development drilling operations for the Liza Phase 1 development. ExxonMobil is also evaluating plans to add another exploration drillship, bringing the number of drillships offshore Guyana to four.

ExxonMobil has previously said there is potential for at least five floating production, storage and offloading (FPSO) vessels on the Stabroek Block producing more than 750,000 barrels of oil per day by 2025. Startup of the Liza Phase 1 development is on track to begin by the first quarter of 2020 and will produce up to 120,000 barrels of oil per day utilizing the Liza Destiny FPSO, which is expected to arrive in country in the third quarter.

Liza Phase 2 is expected to startup by mid-2022. A final investment decision is expected soon subject to government and regulatory approvals. Upon approval, the project plans to use the Liza Unity FPSO to produce up to 220,000 barrels per day. Sanctioning of a third development, Payara, is also expected in 2019, with startup projected for 2023.

The Stabroek Block is 6.6 million acres (26,800 square kilometers). ExxonMobil affiliate Esso Exploration and Production Guyana Limited is operator and holds 45 percent interest in the Stabroek Block. Hess Guyana Exploration Ltd. holds 30 percent interest and CNOOC Petroleum Guyana Limited, a wholly-owned subsidiary of CNOOC Limited, holds 25 percent interest.

Source: ExxonMobil

Check out our other current stories!

Join the largest oil and gas community on iOS and Android!

Download the app here!

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here