Aker BP granted new wildcat permit using the Scarabeo 8

  • By Rig Lynx
  • Feb 07, 2023
  • Category : Archives
  • Views :  

The Norwegian Petroleum Directorate (NPD) has granted Aker BP a drilling permit for well 25/4-15 in production licence PL 919.

The well will be drilled at location 59° 40' 34.54'' N 2° 12' 22.56'' E by the Scarabeo 8 ultra deepwater 6th generation semi-sub.

Licensees are: Aker BP (Operator) 80%; ConocoPhillips Skandinavia 20%.

Planned spud date is Feb 2023.

Source: NPD

Join our mailing list here