
The Norwegian Petroleum Directorate (NPD) has granted Aker BP a drilling permit for well 6405/7-2 S in PL 1005.
The well will be drilled at location 64° 15' 59.41'' N 5° 15' 36.99'' E by the Scarabeo 8 semi-sub.
Licensees are: Aker BP 40%; Vår Energi 40%; Norske Shell 20%.
Planned spud date is June 2023.
Source: NPD
Join our mailing list here