
The Norwegian Petroleum Directorate (NPD) has granted Aker BP a drilling permit for well 25/4-15 in production licence PL 919.
The well will be drilled at location 59° 40' 34.54'' N 2° 12' 22.56'' E by the Scarabeo 8 ultra deepwater 6th generation semi-sub.
Licensees are: Aker BP (Operator) 80%; ConocoPhillips Skandinavia 20%.
Planned spud date is Feb 2023.
Source: NPD
Join our mailing list here