Archives

Home   >   Archives   

bp GOM starts up Thunder Horse South Expansion 2

Rig Lynx
  • By Rig Lynx
  • Sep 28, 2021
  • Category : Archives
  • Views : 994

 

bp has announced the safe and successful start-up of its Thunder Horse South Expansion Phase 2 project. The Phase 2 project is expected to increase output at one of the largest fields in the Gulf of Mexico, with peak annual average gross production of 25,000 barrels of oil equivalent a day from the initial two well tieback. Eventually a total of eight wells are expected to be drilled as part of the project’s overall development.  The Phase 2 start-up is part of bp’s plans to grow its Gulf of Mexico oil and gas production to around 400,000 barrels of oil equivalent a day net by the mid-2020s.

 

Starlee Sykes, bp senior vice president, Gulf of Mexico and Canada, said:

 

'This has been a pivotal year for our Gulf of Mexico business as we continue to start up new projects. Bringing high-margin, resilient barrels online in basins we know best is central to bp’s strategy. Our team has consistently and safely delivered during a pandemic – and with over a million hours worked without a safety incident, this project is no exception. I could not be prouder of the team.'

 

Thunder Horse is bp’s largest production and drilling platform in the Gulf located 150 miles southeast of New Orleans. It is designed to process up to 250,000 barrels of oil and 200 million cubic feet of natural gas per day. bp has a 75% working interest with ExxonMobil holding 25%.

 

Ewan Drummond, bp senior vice president, projects, production and operations said: 

 

'This is another significant milestone for bp, completing the delivery of our planned major projects for 2021.  I am extremely proud of the entire team and their commitment to the safe start-up of Thunder Horse South Expansion Phase 2.  This project is a great example of the type of fast-payback, high-return tie-back opportunities we continue to deliver as we focus and high-grade our portfolio.'

 

Background

 

Thunder Horse South Expansion Phase 2 is located on Mississippi Canyon block 822, Southeast of the bp-operated Thunder Horse platform in 6,350 feet of water.

The Thunder Horse Field was discovered in 1999 and is one of bp’s largest discoveries in the Gulf of Mexico.

 

The project consists of two subsea drill centers operated by 10-inch dual flow lines with the opportunity for simultaneous Mobile Offshore Drilling Unit (MODU) operations.

 

Thunder Horse South Expansion Phase 2 completes the programme of five major project start-ups planned for 2021. Together with the early start-up of the Matapal project in Trinidad, six major projects have come on stream for bp this year.

 

bp is a leading producer in the deepwater Gulf of Mexico, operating four production platforms – Thunder Horse, Atlantis, Mad Dog and Na Kika – with a fifth platform, Argos, expected to come online in 2022.

 

Source: bp

 

Join our mailing list here


We are #1 on Google and Bing for the "Largest Mobile Energy Network"

Come join our community!

Download the Rig Lynx app here

 

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here