
The Norwegian Petroleum Directorate (NPD) has granted Equinor a drilling permit for well 7220/8-3 in production license PL 532.
The well will be drilled at location 72° 26' 57.11'' N 20° 20' 36.82'' E by the Transocean Enabler semi-sub. Expected spud date is April 2022.
Licensees are Equinor (Operator) 50%; Var Energi 30%; Petoro 20%.
Source: PSA
Join our mailing list here