Archives

Home   >   Archives   

ExxonMobil hits 14th discovery in Guyana

Rig Lynx
  • By Rig Lynx
  • Sep 17, 2019
  • Category : Archives
  • Views : 823

ExxonMobil today said it made an oil discovery on the Stabroek Block offshore Guyana at the Tripletail-1 well in the Turbot area.

The discovery adds to the previously announced estimated recoverable resource of over 6 billion oil-equivalent barrels on the Stabroek Block, the US oil major said in a release today. This would be its 14th find since May, 2015.

The announcement came on the heels of another oil find offshore this morning by UK firm Tullow.

Exxon said that Tripletail-1 encountered approximately 108 feet (33 meters) of a high-quality oil bearing sandstone reservoir. Tripletail-1, drilled in 6,572 feet (2,003 meters) of water, is situated approximately 3 miles northeast of the Longtail find. After completion of operations at Tripletail, the Noble Tom Madden drillship will next drill the Uaru-1 well,  approximately 6 miles east of the Liza field.

“This discovery helps to further inform the development of the Turbot area,” said Mike Cousins, senior vice president of exploration and new ventures at ExxonMobil. “Together with our partners, ExxonMobil is deploying industry-leading capabilities to identify projects that can be developed efficiently and in a cost-effective way.”

Exxon said that exploration and development activities are moving forward elsewhere on the Stabroek Block offshore Guyana. The Stena Carron drillship is presently drilling the Ranger-2 well and upon completion will conduct a well test at Yellowtail-1. The Noble Bob Douglas drillship is at the moment completing development drilling operations for the Liza Phase 1 project. ExxonMobil will add a fourth drillship, the Noble Don Taylor, in October 2019 as it continues to optimize drilling plans based on well results and ongoing study of the basin.

The release said that the Liza Phase 1 development remains on schedule to start up by early 2020 and will produce up to 120,000 barrels of oil per day utilizing the Liza Destiny floating production storage and offloading (FPSO), which arrived in Guyana on August 29, 2019.

ExxonMobil, the release said, approved funding for the Liza Phase 2 development after it received government and regulatory approvals in May 2019. Expected to startup by mid-2022, the project plans to use the Liza Unity FPSO to produce up to 220,000 barrels of oil per day. Pending government approvals, Exxon said that a third development, Payara startup could be as early as 2023 and production would reach an estimated 220,000 barrels of oil per day.

The Stabroek Block is 6.6 million acres (26,800 square kilometers). ExxonMobil company Esso Exploration and Production Guyana Limited is operator and holds 45 percent interest in the Stabroek Block. Hess Guyana Exploration Ltd. Has 30 percent interest and CNOOC Petroleum Guyana Limited, a wholly-owned subsidiary of CNOOC Limited, holds 25 percent interest.

Source: Stabroek News

Check out our other current stories!

Join the largest oil and gas community on iOS and Android!

Download the app here!

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here