The Company has signed a Letter of Intent with a view to contracting with Maersk Drilling UK Ltd for the Maersk Resilient jack-up rig to drill the Harvey appraisal well. Built in 2008, the  Maersk Resilient is a high-spec rig with a strong operating history and an excellent safety record. The well is planned to follow on directly from the rig’s current campaign, with the spud date at Harvey currently expected to be in July. In the success case, with full coring and testing, the well would be expected to take approximately two months.
The Company is also close to finalising a contract with Halliburton Manufacturing and Services Ltd to provide offshore drilling services on the Harvey well. As previously announced, Fraser Well Management Ltd  has been appointed as Well Operator for the well. The relevant geophysical and geotechnical surveys for the Harvey well have already been carried out by Fugro GB Marine Ltd in late 2018.
Following the Company’s successful equity fundraise in April 2019, required long-lead items have been ordered and the relevant regulatory approvals and permits reflecting the choice of the Maersk Resilient are being submitted to the OGA for final approvals. These are expected to be granted at the relevant times ahead of the spud date to ensure timely operations.
Source: Independent Oil and Gas
Photo: Maersk
Check out our other current stories!
Join the largest oil and gas community on iOS and Android!
Download the app here!
Rig Lynx was launched December 2017, our oil and gas news was viewed over 373,000 times in 2018 and our social networking application generated over 268,000 clicks in 2018. Our current foothold in the oil and gas industry has rivaled the largest in the industry and we are just getting started. For a complimentary copy of our 2018 Reach Report please send us an email at info@riglynx.com and we will be happy to show you our progress!
Comments (0)