Archives

Home   >   Archives   

North America oil and gas pipeline length to be second in the world by 2024

Rig Lynx
  • By Rig Lynx
  • Jan 12, 2021
  • Category : Archives
  • Views : 296

 

North America is expected to have the maximum share of the global oil and gas trunk/transmission pipeline length by 2024, representing around 43%. Running for a length of 899 399 km, the region continues to lead global pipeline additions by 2024 with 25 335 km, lagging only behind Asia, says GlobalData, a data and analytics company.

GlobalData’s report, ‘Global Oil and Gas Pipelines Industry Outlook to 2024 – Capacity and Capital Expenditure Outlook with Details of All Operating and Planned Pipelines’, reveals that the total length of the global trunk/transmission pipeline network is 2 083 369 km (with start years up to 2024, as of November 2020).

Of the total global pipeline length, among the regions studied, North America is on top with 899 399 km, followed by the Former Soviet Union (FSU) and Asia with 419 021 km, and 225 382 km, respectively.

Adithya Rekha, Oil and Gas Analyst at GlobalData, comments: “Despite the North American transmission pipeline sector having faced several headwinds last year, gradual crude oil price recovery and improvement in the region’s economic outlook means the sector is expected to make a fortunate rebound. This will help retain the region’s global leadership in terms of pipeline length and register an impressive growth in the pipeline network by 2024. It will also sit it in second place worldwide, losing out only to Asia.”

In North America, there are currently 1243 active and suspended pipelines operating with a total length of 874 064 km. The region is expected to witness a total length additions of 25 335 km, representing 22% of the total global length additions.

Expected to start operations in Mexico by 2021, the longest of the upcoming projects is San Fernando–Cactus, with a length of 1609 km. However, this pales in comparison to the onshore natural gas pipeline NGTL System in Canada, the longest active pipeline in North America, which has a length of 24 575 km. Overall crude and natural gas pipelines lead growth in the region.

GlobalData also notes that the FSU is expected to represent 20.1% of the global transmission pipeline length by 2024. The total length of the transmission pipeline network in the FSU is 419 021 km, of which active and suspended pipelines constitute 405 910 km. The region is also expected to witness planned and announced pipeline length additions of 13 111 km by 2024.

The region’s largest active pipeline system – Russian Gas System in Russia – runs for a length of 172 100 km and has pipelines with a diameter ranging from 12 – 56 in.

Rekha concludes: “After North America and the FSU, Asia occupies the third place with a 10.8% share in the global transmission pipeline length. Asia’s total length of crude oil and natural gas pipeline network is 225 382 km. Sui Northern Gas Transmission natural gas pipeline in Pakistan is the longest pipeline in the region with a length of 7915 km."

Source: GlobalData

Join our mailing list here


We are #1 on Google and Bing for the "Largest Mobile Energy Network"

Come join our community!

Download the Rig Lynx app here

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Jan 18, 2021

  Awilco LNG ASA is pleased to announce that the 2013-built 156,000 cbm TFDE WilPride today has been committed on an 2-3 month time charter contract with expected gross revenues of between USD 10.3 million and USD 14.3 million. With forecasted all-in cash break-even of about USD 58,000 per day per vessel in 2021 the contract is estimated to generate surplus liquidity of between USD 6.2 million and USD 8.6 million.   The contract is expected to commence upon redelivery from the current contract in the first half of February 2021.   Gas prices and spot LNG shipping rates have recently increased dramatically for several reasons including cold weather, various production disruptions and fleet inefficiencies. Forward gas prices for the remainder of 2021 has recovered together with consensus shipping rates. The Company’s financial results in 2021 are expected to improve on 2020.   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here

Rig Lynx
Jan 18, 2021

  Based on the previously announced Conditional Letter of Award, Maersk Drilling has been awarded contracts for the deepwater rigs Maersk Valiant and Mærsk Developer from Total E&P Suriname, Suriname Branch, for Total’s exploration and appraisal project in Suriname’s Block 58. Mærsk Developer and Maersk Valiant will be employed for an estimated combined total duration of 500 days. Mærsk Developer is expected to commence operations in January 2021, while Maersk Valiant is expected to commence operations in March 2021. The total value of the firm contracts is approximately USD 100m, including rig modifications, integrated services provided, and a mobilization fee for Maersk Valiant. The contracts include various extension options. “We’re thrilled to firm up these contracts, adding further to our long-standing relationship with Total for whom we have a great track record from our collaboration on a number of deepwater exploration projects. We’re happy to add to our presence in the exciting Suriname-Guyana basin and will be able to leverage the fact that Mærsk Developer is already operating offshore Suriname to quickly start up operations including provision of a range of integrated services to maximise efficiency,” says COO Morten Kelstrup of Maersk Drilling. Mærsk Developer is a DSS-21 column-stabilized dynamically positioned semi-submersible rig, able to operate in water depths up to 10,000 ft. It was delivered in 2009 and is currently mobilizing for the Total campaign after recently completing a contract offshore Suriname. Maersk Valiant is a high-specification 7th generation drillship with integrated Managed Pressure Drilling capability which was delivered in 2013. It is currently warm-stacked in Aruba after finishing a campaign offshore Mexico in June 2020.   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here

Rig Lynx
Jan 16, 2021

  Canada’s Minister of Environment and Climate Change, Jonathan Wilkinson, announced on Monday that the proposed BHP’s Canada Exploration Drilling Project, Equinor’s Central Ridge Exploration Drilling Project and Chevron’s West Flemish Pass Exploration Drilling Project can proceed.   The projects will allow the proponents to determine the presence, nature, and quantities of the potential hydrocarbon resources within their explorations licenses located approximately 350 to 375 kilometers offshore east of St. John’s, Newfoundland and Labrador, the government explained.   The proponents, BHP, Equinor, and Chevron can now proceed with obtaining any additional authorizations and permits from federal departments, as well as the Canada-Newfoundland and Labrador Offshore Petroleum Board.   Read more on each project here:   BHP - BHP Canada Exploration Drilling Project    Equinor- Central Ridge Exploration Drilling Project    Chevron- West Flemish Pass Exploration Drilling Project    Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here