
Stena Drilling has announced a new contract with Far Gambia LTD, utilizing the Stena IceMAX
The drilling program shall be a one (1) well campaign of 30 days, offshore The Republic of Gambia Block A2, commencing between 1 Oct 21 & 30 Nov 21.
Bambo-1 Well
Planning for the Bambo-1 drilling project is well advanced. The Bambo-1 well in Block A2 offshore The Gambia, is designed to drill into three prospects with a total estimated recoverable, prospective resource of 1,118 mmbbls (arithmetic sum of the Best Estimates, 559 mmbbls net to FAR).
Source: Stena Drilling and Far
Join our mailing list here