The VALARIS DS-8 experienced a non-drilling incident while operating offshore Angola resulting in the blowout preventer (BOP) stack being disconnected from the riser while the rig was moving between well locations. The BOP stack dropped to the seabed floor, clear of any subsea structures. Valaris plc has located the BOP stack and is actively working on ways to recover or replace the BOP stack so that operations can be resumed. No injuries, environmental pollution or third-party damage resulted from the BOP stack being disconnected. The Company is investigating the cause of the incident.
The rig is contracted to operate through November 2020 with the French major Total at an operating rate of approximately $620,000 per day.
Source: Valaris
Check out our other current stories!
Join the largest oil and gas community on iOS and Android!
Download the app here!
Comments (0)