Current News

Home   >   Current News   

Valaris's JV ARO awarded 6 jackup contract extensions

Rig Lynx
  • By Rig Lynx
  • Jan 05, 2022
  • Category : Current News
  • Views : 266

 

Valaris Limited announced that it has been awarded new bareboat charter agreements with ARO Drilling for several jackups. ARO Drilling has signed contracts with Aramco for the same periods as the bareboat charter agreements.

 

Heavy-duty harsh environment jackup VALARIS 250, heavy-duty modern jackup VALARIS 116 and standard-duty modern jackups VALARIS 143 and 146 will each commence three-year extensions to their bareboat charter agreements upon completion of their existing agreements with ARO Drilling in December 2021.

 

Also, ARO Drilling owned rigs ARO 3003 and ARO 3004 have each been awarded five-year contract extensions with Aramco that will commence upon completion of their existing contracts in December 2021.

 

Valaris’ President and Chief Executive Officer Anton Dibowitz said, “We are very pleased to have secured additional work for four of our high-quality modern jackups, extending our long-standing relationship with Aramco, one of the largest customers for offshore drilling rigs in the world. ARO Drilling is a strategic asset for Valaris, providing a continued presence in an important offshore basin and long-term growth prospects via ARO’s twenty-rig newbuild program, with the first two newbuild jackups expected to be delivered in the second half of 2022. We look forward to continuing to work with our joint venture partner, Aramco, on growing and delivering value from ARO Drilling."

 

Source: Valaris

 

Join our mailing list here


We are #1 on Google and Bing for the "Largest Mobile Energy Network"

Come join our community!

Download the Rig Lynx app here

 

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Jan 15, 2022

  TotalEnergies E&P Suriname, Suriname Branch has exercised an option to add the drilling of one additional well in Block 58 offshore Suriname to the work scope of the drillship Maersk Valiant. The contract extension has an estimated duration of 100 days, with work expected to commence in March 2022 in direct continuation of the rig’s previously agreed work scope. The contract value of the extension is approx. USD 20.5m, including integrated services provided. Two one-well options remain on Maersk Valiant’s contract with TotalEnergies. Source: Maersk Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Jan 15, 2022

  Saipem has been awarded two new offshore contracts in Australia and Guyana, for a total amount of 1.1 billion USD.   Regarding the first contract, Saipem has received the Notice to Proceed (NTP) from Woodside, as Operator for and on behalf of the Scarborough Joint Venture, for a contract related to the Scarborough project. Saipem will complete the export trunkline coating and installation of the pipeline that will connect the Scarborough gas field with the onshore plant.    The Scarborough gas resource is located in the Carnarvon Basin, offshore Western Australia, and it will be developed through new offshore facilities connected by an approximately 430 km export trunkline with a 36”/32” diameter to a second LNG train (Pluto Train 2) at the existing Pluto LNG onshore facility. The development will be among the lowest carbon intensity sources of LNG globally. The first cargo is expected to be delivered in 2026.   The work assigned to Saipem is relevant to coating, transportation and installation of the trunkline, at a maximum water depth of 1,400 meters, including the fabrication and installation of the line structures and of the pipeline end termination in 950-meter water depth. Offshore operations are planned to start in mid-2023 and will be mainly conducted by the Castorone vessel.   The Scarborough Joint Venture comprises Woodside Energy Scarborough Pty Ltd (73.5%) and BHP Petroleum (Australia) Pty Ltd (26.5%). Woodside and BHP announced on 22 November 2021 that a final investment decision has been made by the Scarborough Joint Venture to proceed with the Scarborough Project.   The second contract has been assigned to Saipem by Esso Exploration and Production Guyana Limited (EEPGL), a subsidiary of ExxonMobil, for the Yellowtail development project located in the Stabroek block offshore Guyana at a water depth of around 1,800 meters.    Pending the necessary government authorizations and investment approval, the assignment of the contract allows the start of initial engineering and procurement activities necessary to proceed in accordance with the project program.   The contract relates to the Engineering, Procurement, Construction, and Installation (EPCI) of the Subsea Umbilicals, Risers & Flowlines (SURF).  Yellowtail is intended to be a greenfield development project encompassing subsea drilling centres, (each equipped with separate oil production, water injection and gas injection wells), linked to a new FPSO (Floating Production Storage and Offloading Unit).   Saipem’s flagship vessel FDS2 will conduct the offshore operations while Saipem’s fabrication facility in Guyana will build the deepwater structural elements.   Francesco Caio, CEO and General Manager of Saipem, commented:   'The award of these contracts represents a significant confirmation of the trust of our clients in Saipem’s ability to execute complex offshore projects worldwide. The Scarborough project will be mainly conducted by the Castorone vessel, our versatile and state-of-the-art asset, representative of the innovative and world-class offer which Saipem is able to provide the market. The recently opened Saipem fabrication facility in Georgetown will be involved in the execution of the Yellowtail project, ensuring a positive and tangible impact on the country'.   Source: Saipem   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Jan 15, 2022

  Eni has been awarded five new exploration licenses by the Egyptian Ministry of Petroleum. The licenses, four of which as Operator, are in the Egyptian offshore and onshore, and follow the successful participation to the 2021 competitive 'Egypt International Bid Round for Petroleum Exploration and Exploitation' which was previously announced by the Egyptian General Petroleum Corporation and the Egyptian Natural Gas Holding Company through the Egypt Exploration and Production Gateway.   The licenses are located in the Eastern Mediterranean Sea (Block 'EGY-MED-E5' in partnership with BP 50%-50% and Block 'EGY-MED-E6' IEOC 100%), in the Gulf of Suez (Block 'EGY-GOS-13' IEOC 100%) and in the Western Desert (Blocks 'Egy-WD- 7' in partnership with APEX 50%-50% and 'EGY-WD-9' IEOC 100%) with a total acreage of about 8,410 sq km. The licenses are placed within prolific basins with proved petroleum systems able to generate liquid and gaseous hydrocarbons and can also rely on nearby existing producing and processing facilities and on a demanding market that will allow a quick valorization of the potential exploration discoveries.   The bid results are aligned with Eni’s strategy to keep exploring and producing gas to sustain the Egyptian domestic market and contribute to LNG export, thanks to the recent restart of the Damietta LNG plant.   Eni has been present in Egypt since 1954 and is currently the country's main producer with equity hydrocarbon production of around 350,000 barrels of oil equivalent per day.   Source: Eni   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here