Archives

Home   >   Archives   

Baker Hughes lands major LNG deal in Qatar

Rig Lynx
  • By Rig Lynx
  • Oct 01, 2020
  • Category : Archives
  • Views : 1022

 

Baker Hughes announced an order with longtime partner Qatar Petroleum to supply multiple main refrigerant compressors (MRCs) for Qatar Petroleum’s North Field East (NFE) project, executed by Qatargas. The total award is part of four LNG “mega trains,” representing 33 million tons per annum (MTPA) of additional capacity, which will increase Qatar’s total liquefied natural gas (LNG) production capacity from 77 MTPA to 110 MTPA and help to propel the Gulf nation to global LNG production leadership by 2025. This order is among the largest LNG deals secured by Baker Hughes in the past five years, for both MTPA and equipment awarded.

 

The order reinforces more than two decades of trust and successful turbomachinery collaboration between Baker Hughes, Qatar Petroleum and Qatargas. With Qatargas already operating six existing LNG “mega trains” driven by Frame 9E gas turbine refrigerant compressors provided by Baker Hughes, the NFE project underscores the leadership of Baker Hughes LNG technology in the Gulf region and for the world’s most complex LNG projects.

 

“This milestone deal illustrates the continued strength of Baker Hughes’ partnership with Qatar Petroleum, which began 25 years ago upon our delivery of the first LNG train in Qatar,” said Lorenzo Simonelli, chairman and CEO of Baker Hughes. “As we look ahead to the next two decades, in almost any scenario natural gas will be a key transition fuel, and likely a destination fuel for a lower carbon future. Building on our track record of delivering proven, reliable and highly efficient LNG technology, we remain committed to taking energy forward in Qatar for more years to come.”

 

As part of the company’s commitment to support customers in decarbonizing their operations, Baker Hughes has continuously invested in developing technology that enables customers to reduce emissions, enhance performance and optimize operations. The NFE project will feature the latest compression technology to reduce 60,000 tons of CO2 per train each year without any reduction in LNG production, representing a ~5 percent decrease versus previous technologies. The compression trains will also be produced using the latest manufacturing techniques, minimizing raw material and emission-intensive processes to reduce CO2 emissions during production by up to 10 percent.

 

Each MRC train will consist of three Frame 9E DLN Ultra Low NOx gas turbines and six centrifugal compressors across four LNG “mega trains” for a total scope of supply of 12 gas turbines to drive 24 centrifugal compressors. Packaging, manufacturing and testing of the gas turbine/compressor trains will take place at Baker Hughes’ facilities in Florence and Massa, Italy.

 

The North Field is the world’s single largest non-associated natural gas field. The NFE project, owned by Qatar Petroleum and operated by Qatargas, is the first phase of the North Field LNG Expansion Project, announced in 2017, and will increase Qatar’s LNG production capacity from 77 MTPA to 110 MTPA, which accounts for an LNG production capacity increase of approximately 43 percent. First gas from the Expansion Project is expected to be produced by the end of 2025. The second phase of the North Field LNG Expansion Project, called the North Field South project (NFS), will further increase Qatar’s LNG production capacity from 110 MTPA to 126 MTPA.

 

Qatargas is entrusted with executing the NFE project on behalf of Qatar Petroleum. As the world’s premier LNG company, Qatargas has an established history in delivering such major projects and in operating various onshore and offshore facilities in the North Field with a high degree of reliability and operational excellence. The project is in line with Qatar’s National Vision 2030, which aims for more sustainable development by 2030.

 

Source: Baker Hughes

 

We are #1 on Google and Bing for the "Largest Mobile Energy Network"

Come join our community!

Download the Rig Lynx app here

 

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here