Archives

Home   >   Archives   

Subsea 7 awarded subsea contract from Beacon Energy

Rig Lynx
  • By Rig Lynx
  • Jan 30, 2022
  • Category : Archives
  • Views : 975

 

Subsea 7 has announced the award of a substantial (1) project for subsea installation services related to Beacon Offshore Energy’s Shenandoah Development, located offshore Gulf of Mexico in water depths up to 6,300 feet.

 

The project covers the tie-back of four subsea wells to the Shenandoah host facility through a subsea manifold with dual flowlines and risers. The work scope includes engineering, procurement, construction, installation ('EPIC') and commissioning of the subsea equipment including structures, umbilicals, and production and gas export flowlines. Subsea 7’s scope also includes the wet tow and hook-up of the semi-submersible FPS to the field and mooring system installation.

 

Project management and engineering will commence immediately at Subsea 7’s offices in Houston, Texas. Fabrication of the flowlines and risers will take place at Subsea 7’s spoolbase in Ingleside, Texas, with offshore operations scheduled for 2024.

 

Craig Broussard, Vice President for Subsea 7 US, said, 'We are pleased to have been selected as a partner for the delivery of the Shenandoah development. This project allows Subsea 7 to demonstrate the full capacity of our offering, including our extensive involvement in mooring and installation of host facilities, EPIC activities related to the flowline system, and utilizing our industry leading experience and welding capabilities to support the development of high-pressure fields. We look forward to building on the collaborative approach demonstrated by the Shenandoah project to form a long-term cooperative relationship in support of Beacon Offshore Energy’s future growth plans.'

 

(1) Subsea 7 defines a substantial project as being between USD 150 million and USD 300 million.

 

Source: Subsea 7

 

Join our mailing list here


We are #1 on Google and Bing for the "Largest Mobile Energy Network"

Come join our community!

Download the Rig Lynx app here

 

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here