Archives

Home   >   Archives   

Is it the right time to revive the Vladivostok-Seoul pipeline? | OutPut by Rig Lynx

Rig Lynx
  • By Rig Lynx
  • Jun 25, 2018
  • Category : Archives
  • Views : 88

The June 12 Trump-Kim summit in Singapore has had an overall positive effect on the oil industry, cooling down expectations about the imminence of a major conflict driven by the reckless behavior of leading political figures. Yet behind numerous geopolitical consequences, the discussion of which has taken up most of the media space, the summit also gave rise to smaller, regional ones. One of such is the resurgence of the Russia – North Korea – South Korea gas pipeline, which it seems is back on the agenda of both Moscow and Seoul. Gazprom’s admission that negotiations have been relaunched upon South Korea’s request is a harbinger of significant things to come.

The Russia-Korea gas pipeline has been on the tapis for more than 20 years. It was first raised in 1995 on the back of East Siberian gas fields being gradually brought onstream – even though the idea eventually evolved into the 38 BCm Power of Siberia project, the possibility of traditionally LNG-reliant Korea having its first onshore gas pipeline was flaunted regularly. The pipeline was supposed to pass start in the Russian city Vladivostok, then swerve towards North Korea, reaching Seoul in the end. It was never doubted that from the Russian side it would be Gazprom supplying the gas, since it has an export monopoly, from the South Korean side KOGAS and LG were mentioned amongst potential participants.

Despite what one might perceive as an extremely hostile business environment (North Korean warmongering), the project has maintained a firm government buttress from both Moscow and South Korea. The massive investment required on the territory of DPRK was thought to moderate North Korean temper, since the regime would be interested in the constant flow of transit revenues and not risk any escalation. In 2011, everything seemed ready to implement the plan – the Russia-born then-Supreme Leader Kim Jong-Il agreed for the pipeline to pass through DPRK, whilst Gazprom and KOGAS have signed a roadmap for the construction of a 10 BCm/year gas conduit. Yet Kim’s passing away in December 2011 and events unfolding afterwards have put the project off indefinitely.

Now, following several North Korean nuclear tests against the background of a very ambivalent relationship with the United States, Russia and South Korea reckon the time is ripe to revive the Vladivostok-Seoul pipeline. Do not expect legally binding obligations, though – it is evident that the any sort of agreement is highly dependent on Moon Jae-In remaining in office (and continuing his so far very successful policy of engagement with the Juche regime) and Donald Trump not making a U-turn on his commitments (he has gone from „little rocket man” to a „pretty smart cookie” within 9 months, after all). Trust-building needs time, especially when it comes to large-scale infrastructure projects.

At the core of the Vladivostok-Seoul gas pipeline is South Korea’s almost unprecedented dependence on imports to cover its energy needs – the rate stands at 98-99 percent for quite some time already. South Korea’s traditional means of generating energy largely boiled down to nuclear power and LNG, yet after the 2011 Fukushima catastrophe nuclear is about to be gradually removed from the national energy matrix. Korea’s LNG import capacities are undoubtedly spectacular, as the nation’s 4 LNG terminals can process up to 120 BCm per annum, double of South Korea’s actual natural gas needs. Yet if one is to compare LNG imports to South Korea and Gazprom’s exports to Europe, it becomes evident that Seoul has been overpaying massively.

——Download our free app and connect with the Next Generation of Oil and Gas——

Two-thirds (roughly 700km) of the Vladivostok-Seoul pipeline are supposed to pass through North Korean territory and there is no way of telling if there could be any sort of illegal tapping there. And if irregularities were to happen, how could Russia or South Korea make them stop? The last thing Russia needs is a potentially nuclear replica of Ukraine on its Far-Eastern border. If one is to see the glass half-full, the time it would take to sort out the details of the pipeline deal might be an advantage – many issues might evaporate if the promised denuclearization goes along as planned (and promised). If not, the plug on the deal can be swiftly pulled with minimal losses.

Thus, time is the biggest friend and enemy of the Russia – South Korea gas pipeline. Once (and if) the project is agreed upon, it will still take 3-4 years to actually build it, even in case of a fast-tracked procedure. Time would also help Russia understand where to source the natural gas from – whether from the E-Siberian fields of Kovykta and Chayanda or from elsewhere – and how to amend its transmission infrastructure so that the new pipeline would not interfere with Power of SIberia, slated to start on December 20, 2019. Yet two seemingly rational actors (Gazprom and KOGAS) depend on the dealmaking capacities of two seemingly irrational ones (Kim Jong-Un and Donald Trump). We will see how it all shakes out.

By Viktor Katona for Oilprice.com

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here