Archives

Home   >   Archives   

Mid 2020 before new Nigerian refinery comes online | OutPut by Rig Lynx

Rig Lynx
  • By Rig Lynx
  • Jul 07, 2018
  • Category : Archives
  • Views : 512

Africa’s richest man Aliko Dangote, who is financing the construction of one of the world’s largest oil refineries, believes that the 650,000-bpd facility could be near its full capacity by the middle of 2020, which would be some one and a half years later than the originally planned startup date.

Back in 2016, Dangote, a construction and concrete magnate worth around US$15 billion at that time, told CNNMoney that the refinery would aim to meet all of Nigeria’s daily demand for fuels of up to 550,000 bpd. The excess, he said, would be exported. At that time, some initial works for the refinery were already under way, with plans to bring it online by late 2018.

In mid-2016, Dangote wasn’t worried about low oil prices because refiners win in low oil price environments, as margins are high.

“People who own refineries are the best out there, making money,” Dangote told CNNMoney in June 2016. “The lower the crude oil price, the more profit that you make in terms of refining margin.”

It looks like that the startup date has been pushed out several times.

According to a 2017 PwC report on Nigeria’s refining industry, the Dangote refinery—a crucial development in the sector—was expected to come on stream by 2019. In all of PwC’s scenarios on Nigeria’s refining sector, the Dangote refinery was assumed to “open its gates mid-2019.”

“At optimal utilisation, the refinery is capable of meeting the country’s demand, however a major headwind to achieving a fully optimised run, is availability of crude feedstock,” PwC said.

“We’re flexible in terms of our feedstock,” Edwin Devakumar, group executive director at Dangote Industries Ltd, told Bloomberg in an interview published today. The refinery will be able to process all the African, American, and Middle Eastern crude grades, as it doesn’t want to be dependent on Nigerian crude, he added.

The Nigerian company has talked to Shell, Vitol, and Trafigura about the oil traders possibly supplying the refinery with crude and buying the refined products, but nothing specific has been decided yet, Devakumar told Bloomberg.

Original Article Here 

Check out our other current stories, we dare you…

——Want to connect with people like you?——

Want a career in the Oil and Gas?

Connect with them!

Download the app free right here!

 

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here