Archives

Home   >   Archives   

PTTEP moves forward with 2020 exploration plans

Rig Lynx
  • By Rig Lynx
  • Apr 16, 2020
  • Category : Archives
  • Views : 1009

PTTEP remains confident to move forward with its 2020 business plan under the current global oil price crisis and the spread of coronavirus (COVID-19). The reasons are its strong financial position and high liquidity attributed to its competitive cost structure, oil price hedging and secured natural gas selling prices as per sales agreements. The company is ready to be flexible with its investment plan to cope with challenging circumstances in the future.

Mr. Phongsthorn Thavisin, President and Chief Executive Officer of PTT Exploration and Production Public Company Limited (PTTEP), said due to the COVID-19 outbreak and the global oil price collapse of over 60% since March 2020, PTTEP’s volume this year would not experience a significant impact. The average sales volume previously targeted for this year at 388,000 barrels of oil equivalent per day (BOED) is expected to decrease by less than 5% as sales volume of natural gas, which represents the majority of PTTEP’s products, has already been secured in accordance with the sales agreement. On the average selling price front, crude oil sales, which accounts for roughly 30% of total sales volume, will be directly impacted by the oil price volatility although with insulation from partial crude price hedges in place. Meanwhile, natural gas prices of several projects have already been determined in accordance with the gas sales agreements. However, if the low-oil price environment is prolonged, it will likely continue impacting PTTEP in future periods.

“Another strength of PTTEP is that we are now a low-cost structure oil and gas company when compared with our peers as we prioritized of our efforts in the past 4-5 years during the global oil price crisis to streamline our cost structure. In addition, the majority of our investments are focused in Thailand, Malaysia, Myanmar and the Middle East, which are considered to be areas with low operating costs compared to other regions. As a result, the company’s operating cash flows as well as financial status remain robust, evidencing our ability to sustain for at least 2-3 years in this period of volatility. However, to ensure we are well-positioned to navigate a possible prolonged low-oil price environment, PTTEP is considering revising its investment plan such as maximizing efficiency of capital management and postponing drilling plans of selected projects. Even though some plans have to be revisited, our utmost priority is to ensure no impact to our future operations and no interruptions to the energy supply of the country,” said Phongsthorn.

The investments in G1/61 (the Erawan field) and G2/61 (the Bongkot field) will continue as planned in order to deliver a combined natural gas volume of 1,500 million cubic feet per day (MMSCFD) as per the Production Sharing Contracts (PSC) starting in 2022-2023.

Phongsthorn continued that the COVID-19 outbreak has affected all industries extensively. PTTEP has implemented the Business Continuity Management (BCM) plan to ensure uninterrupted supply of petroleum to the country. The company also sets a very high priority on preventing the spread of the virus on organization grounds. At the head office, PTTEP implements the Work from Home policy, while strictly increasing safety measures at all operating sites both offshore and onshore, in upcountry and overseas. The safety measures also extend to the company’s stakeholders as PTTEP postponed the 2020 Annual General Meeting to reduce the risk of the virus spreading while keeping dividend payment unchanged.

PTTEP has actively sponsored frontline organizations that are handling the outbreak by, for example, donating fabric masks to Chatuchak District office for distribution to people in-need and donating alcohol to Chulalongkorn University to produce hand sanitizers for the public. The company also supports academic institutions and hospitals in developing innovations and solutions that will reduce and contain the spread of the virus, including Chula COVID-19 Strip Test, VISTEC Test Kit Diagnostics, Mobile Negative Pressure Chamber, as well as provides funding for ambulances and ventilators.

“I believe that every organization in Thailand shares the same goal to ensure the safety of the Thai people. PTTEP stands ready to collaborate with the public sectors and various other organizations at our full capabilities. At the same time, we ensure that PTTEP will continue our mission of petroleum exploration and production to deliver reliable energy sources for Thailand and for Thai people, as we together fight to overcome this difficult situation” Phongsthorn said.

Source: PTTEP

Check out our other current stories!

Join the largest oil and gas community on iOS and Android!

Download the app here!

Comments (0)

Leave Comment


Check out our other stories

Rig Lynx
Mar 09, 2023

  Valaris Limited announced new contracts awarded subsequent to issuing the Company’s most recent fleet status report on February 21, 2023.   Three-year contract with Petrobras for drillship VALARIS DS-8. The rig will be reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee. 100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023. 70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million. President and Chief Executive Officer Anton Dibowitz said, “We are particularly pleased to have secured the award for preservation stacked drillship VALARIS DS-8, for a contract that is expected to generate a meaningful return over the firm contract term, and we remain focused on exercising our operational leverage in a disciplined manner. This most recent award represents the sixth contract awarded to one of our high-quality stacked floaters since mid-2021, and speaks volumes about our demonstrated track record of project execution when reactivating rigs.”   Dibowitz added, “Following the reactivation of VALARIS DS-17 and DS-8, we will have ten floaters working across the golden triangle, including four drillships in Brazil, a market where we expect to see continued growth over the next several years.”   Updated Guidance   As a result of the contract awarded to VALARIS DS-8, which will require the rig to be reactivated from preservation stack, we are updating our first quarter 2023 and full-year 2023 guidance provided on our fourth quarter 2022 conference call on February 21, 2023.   First Quarter 2023   Contract drilling expense is expected to increase by approximately $5 million to $385 million to $395 million. Adjusted EBITDA is expected to decrease by approximately $5 million to negative $5 million to breakeven. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $25 million to $30 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Full-Year 2023   Revenues are anticipated to be $1.8 billion to $1.9 billion, unchanged from the guidance provided on our fourth quarter 2022 conference call. Contract drilling expense is expected to increase by approximately $60 million to $1.49 billion to $1.59 billion. Adjusted EBITDA is expected to decrease by approximately $60 million to $180 million to $220 million. Adjusted EBITDAR, which adds back one-time reactivation expense, is expected to be $280 million to $320 million, unchanged from the guidance provided on our fourth quarter 2022 conference call. Capital expenditures are expected to increase by $60 million to $320 million to $360 million. Source: Valaris Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Seadrill Limited announced that the West Neptune has executed approximately six months of term extensions with LLOG Exploration Offshore, L.L.C in the US Gulf of Mexico.   The extensions will commence in direct continuation of the existing term, and will keep the rig busy until Q3 2024, furthering Seadrill and LLOG’s long-term association. Total contract value for the extension is approximately $79 million. Source: Seadrill   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here  

Rig Lynx
Mar 09, 2023

  Semisub rig owner Dolphin Drilling has inked a new contract with Peak Petroleum in Nigeria for its 1974-built Blackford Dolphin.   The firm contract, which follows the letter of award in January, gives the Euronext Growth-listed owner of three rigs the potential to extend the unit’s backlog by a minimum of 120 days and up to 485 days. The deal adds to and will be a direct continuation of the previously announced 12-month contract with General Hydrocarbon Limited (GHL).   Øystein Stray Spetalen-backed company said the effective dayrate associated with the minimum firm period of the contract is $325,000, including the mobilisation fee.   “The final award of the contract for Blackford Dolphin shows the opportunities in Nigeria at a strong dayrate, in addition to building on the backlog for the rig. It also underlines the attractiveness of our assets, and we look forward to returning to revenue-generating operations in 2023,” noted Bjørnar Iversen, CEO of Dolphin Drilling.   Source: Dolphin   Join our mailing list here We are #1 on Google and Bing for the "Largest Mobile Energy Network" Come join our community! Download the Rig Lynx app here